{UAH} 229m dollars for a 9-kilometer stretch of road?

 There inherently something wrong!
It is a lot of money.

However, these are mistakes of planning. From Kibuye to the former Kaypin (sp) is a wetland logged with a lot of water in fact it is at the same level as Lake Victoria. Then we have Nalukolongo to Natete - this stretch is almost the same as the previous one above.

Any company will demand lots of money since they have to use a completely different road construction design i.e. using different levels of aggregate.


Does this amount to the cost sited above?


That remains a technical issue between planners, road construction engineers and UNRA and Ministry of Transport and for which purpose the road is to be used.



--

_____________________________
Bwanika Nakyesawa Luwero

--
Disclaimer:Everyone posting to this Forum bears the sole responsibility for any legal consequences of his or her postings, and hence statements and facts must be presented responsibly. Your continued membership signifies that you agree to this disclaimer and pledge to abide by our Rules and Guidelines.To unsubscribe from this group, send email to: ugandans-at-heart+unsubscribe@googlegroups.com

Sharing is Caring:


WE LOVE COMMENTS


Related Posts:

0 comments:

Post a Comment

Popular Posts

Blog Archive

Followers